So we need lesser length than we see in the drawing. ![]() Number of Stirrups Formula: Number of Stirrups Formulaīend increases the length of bar. Number of Bars Formula: Number of Bars Formula Spacing in Reinforcement: Spacing in Reinforcement Overlapping Formula : Overlapping formula | Reinforcement Calculation ExcelĬoncrete Cover or Clear Cover in Reinforcement: Concrete Cover or Clear Cover in Reinforcement | bar bending schedule formula calculation Cover x 2), if you need bend deduction then you should deduct 4d (2d + 2d) for two 90 Deg bends from main bar cutting length. Cover x 2), Note: Hook Length in Stirrups should be 10d or 75mm, where d is dia of bar.Ĭutting Length of Main Bar with Bend Formula: Cutting Length of Main Bar with Bend Formula Weight of One Steel Bar in Kg/Bar Formula: Weight of One Steel Bar in Kg/Bar | BBS FormulaĬutting Length of Main Bar with Hook Formula: Cutting Length of Main Bar with Hook Formula Weight of Steel Bar Formula Per Feet (Kg/ft): Weight of Steel Bar Formula Per Feet (Kg/ft) Weight of One Steel Bar in Kg/Bar Formula:Ĭutting Length of Main Bar with Bend Formula | Bar Bending Schedule Basic Formulas Weight of One Steel Bar in Kg/Bar Formula: Weight of Steel Bar Formula Per Meter (Kg/m): Weight of Steel Bar Formula in Kg Per Meter (Kg/m) | bbs formula Diameter of Bar (mm) Unit weight in kg/m 8 0.395 10 0.617 12 0.889 16 1.580 20 2.469 25 3.858 32 6.321 40 9.877 ![]() Standard Length of Bar in Feet: Standard Length of Rebar in Feet | BBS Formula Standard Length of Bar in Meter: Standard Length of Bar in Meters | BBS Formulaĭiameter of Reinforcement Bars in Inches/No’s: Diameter of Reinforcement Bars in inches | BBS formula Use the bar bending schedule as a reference during the construction process to guide the workers in cutting, bending, and placing the rebars.īasics of Bar Bending Schedule Formulas | BBS Calculation Formulas:ĭiameter of Reinforcement Bars in MM: Diameter of Reinforcement bars in mm.Review the bar bending schedule to ensure that it is complete and accurate.Double-check the bar bending schedule calculation to ensure accuracy and minimize errors.Solid understanding of the details and factors influencing the actual construction.The bar mark must climb steadily starting at 01 points.For instance, before moving on to the next floor, all ground floor components must be planned, and all footing must be completed before moving on to the starter columns. Arrange the structural components by floor.Inspect each structural element’s tension and compression bars’ lapping lengths.We should follow the following steps during the preparation of bar bending schedule: Steps in preparing a bar bending schedule (BBS) using formulas:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |